4.7
Production Planning and Controlling (J06)
SAP AG
Neurottstr. 16
69190 Walldorf
Germany
Building Block Configuration Guide
Copyright
Icons
Icon | Meaning |
Caution | |
Example | |
Note or Tip | |
Recommendation | |
Syntax |
Type Style | Description |
Example text | Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options. Cross-references to other documentation. |
Example text | Emphasized words or phrases in body text, titles of graphics and tables. |
EXAMPLE TEXT | Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE. |
Example text | Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools. |
EXAMPLE TEXT | Keys on the keyboard, for example, function keys (such as F2) or the ENTER key. |
Example text | Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation. |
<Example text> | Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries. |
Contents
6
6
6
6
6
7
7
7
7
7
8
10
11
17
18
19
19
20
21
22
23
23
24
24
25
26
26
27
28
28
29
31
32
33
35
36
36
The purpose of this document is to describe the general configuration steps required to manually set up the configuration within the system landscape that has already been installed using the corresponding installation or configuration guides for installation.
The Building Block Configuration Guide describes how to set up the configuration of a building block manually, without the support of automated configuration tools. If you want to use BC Sets, LSMW, ECATT and CATT procedures for an automated installation process, refer to the Building Block Installation Guide of this building block
List dependencies with other building blocks and describe the general prerequisites that you have to fulfill to install this building block. Do not repeat preparation settings already described in other building block guides.
configuration role and assign it to your user.
This building block provides a configuration role for each SAP component that is involved in its configuration, such as SAP APO; SAP R/3, or SAP CRM. The configuration role enables you to comfortably access all transactions required for the configuration from the relevant system. The following roles are available:
Technical name | Description | File name for upload |
---|---|---|
/SMB12/J06_01I | J06 Production Planning | _SMB12_J06_01I.SAP |
Essential Information.
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S300_J06_01 - Sales & Operations Planning (SOP) |
Transaction Code | SPRO |
IMG Menu | Production à Sales & Operation Planning (SOP) à Master Data à Set Planning Plant for SOPà Maintain SOP Planning Plant |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | Plnt |
BP01 | X |
BP02 | X |
BP03 | X |
BP0X | X |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | SPRO |
IMG Menu | Production à Material Requirements Planning à Master Data à Define MRP Controllers |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | MRPCn | Name 1 | Name |
BP01 | 工厂BP01 | 001 | MRP控制者 |
BP01 | 工厂BP01 | Y01 | MRP控制者-成品 |
BP01 | 工厂BP01 | Y02 | MRP控制者-其他 |
BP02 | 工厂BP02 | 001 | MRP控制者 |
BP02 | 工厂BP02 | Y01 | MRP控制者-成品 |
BP02 | 工厂BP02 | Y02 | MRP控制者-其他 |
BP03 | 工厂BP03 | 001 | MRP控制者 |
BP03 | 工厂BP03 | Y01 | MRP控制者-成品 |
BP03 | 工厂BP03 | Y02 | MRP控制者-其他 |
BP0X | 工厂BP0X | 001 | MRP控制者 |
BP0X | 工厂BP0X | Y01 | MRP控制者-成品 |
BP0X | 工厂BP0X | Y02 | MRP控制者-其他 |
4. Choose
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | SPRO |
IMG Menu | Production à Material Requirements Planning à Master Data à Define Special Procurement Type |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | SP type | Long Text EN |
| Proc type | Sp.proc. | Plnt | Direct productn | Phantom item |
BP01 | 10 | BP Consignment | BP 外部采购-寄售 | F | 2 |
|
|
|
BP01 | 20 | BP External procurement | BP 外部采购 | F | 0 |
|
|
|
BP01 | 30 | BP Subcontracting | BP 外部采购-分包 | F | 3 |
|
|
|
BP01 | 40 | BP Stk transf (proc.fr alter.plant) | BP 库存转换(来自可选工厂的产品) | F | 7 | BP02 |
|
|
BP01 | 45 | BP Stk transf fr plant to MRP area | BP 库存从工厂到 MRP 范围 | F | 7 | BP02 |
|
|
BP01 | 50 | BP Phantom assembly | BP 虚无装配 | E | E |
|
| X |
BP01 | 52 | BP Direct prodn / collective order | BP 直接生产/收集订单 | E | E |
| X |
|
BP01 | 60 | BP Phantom in planning | BP 虚拟计划 | E | E |
|
|
|
BP01 | 70 | BP Withdrawal from alternative plant | BP 从替代工厂领料 | E | E |
|
|
|
BP01 | 80 | BP Production in alternative plant | BP 在替代工厂生产 | E | P | BP02 |
|
|
BP02 | 10 | BP Consignment | BP 外部采购-寄售 | F | 2 |
|
|
|
BP02 | 20 | BP External procurement | BP 外部采购 | F | 0 |
|
|
|
BP02 | 30 | BP Subcontracting | BP 外部采购-分包 | F | 3 |
|
|
|
BP02 | 40 | BP Stk transf (proc.fr alter.plant) | BP 库存转换(来自可选工厂的产品) | F | 7 | BP01 |
|
|
BP02 | 45 | BP Stk transf fr plant to MRP area | BP 库存从工厂到 MRP 范围 | F | 7 | BP01 |
|
|
BP02 | 50 | BP Phantom assembly | BP 虚无装配 | E | E |
|
| X |
BP02 | 52 | BP Direct prodn / collective order | BP 直接生产/收集订单 | E | E |
| X |
|
BP02 | 60 | BP Phantom in planning | BP 虚拟计划 | E | E |
|
|
|
BP02 | 70 | BP Withdrawal from alternative plant | BP 从替代工厂领料 | E | E |
|
|
|
BP02 | 80 | BP Production in alternative plant | BP 在替代工厂生产 | E | P | BP01 |
|
|
BP03 | 10 | BP Consignment | BP 外部采购-寄售 | F | 2 |
|
|
|
BP03 | 20 | BP External procurement | BP 外部采购 | F | 0 |
|
|
|
BP03 | 30 | BP Subcontracting | BP 外部采购-分包 | F | 3 |
|
|
|
BP03 | 40 | BP Stk transf (proc.fr alter.plant) | BP 库存转换(来自可选工厂的产品) | F | 7 | BP01 |
|
|
BP03 | 45 | BP Stk transf fr plant to MRP area | BP 库存从工厂到 MRP 范围 | F | 7 | BP01 |
|
|
BP03 | 50 | BP Phantom assembly | BP 虚无装配 | E | E |
|
| X |
BP03 | 52 | BP Direct prodn / collective order | BP 直接生产/收集订单 | E | E |
| X |
|
BP03 | 60 | BP Phantom in planning | BP 虚拟计划 | E | E |
|
|
|
BP03 | 70 | BP Withdrawal from alternative plant | BP 从替代工厂领料 | E | E |
|
|
|
BP03 | 80 | BP Production in alternative plant | BP 在替代工厂生产 | E | P | BP01 |
|
|
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OMDX |
IMG Menu | Production à Material Requirements Planning à Planning à MRP Calculation à Define Planning Horizon à Plant |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | PlHor |
BP01 | 100 |
BP02 | 100 |
BP03 | 100 |
BP0X | 100 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OPPQ |
IMG Menu | Production à Material Requirements Planning à Plant Parameters à Carry Out Overall Maintenance of Plant Parameters à Maintain |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | MRPCn | Name |
BP01 | 001 | Disponent |
BP02 | 001 | Disponent |
BP03 | 001 | Disponent |
6. Make the following entries:
Plnt | FrmPO | Fm.PR | OrdIt | Resch | Tval. | TolVa | PlHor | NR | NR | ItPRq | NR | NR | ISTRe |
BP01 | X | X | X | 100 | 02 | 02 | 100 | 01 | 01 | 00010 | 01 | 01 | 0100 |
BP02 | X | X | X | 100 | 02 | 02 | 100 | 01 | 01 | 00010 | 01 | 01 | 0100 |
BP03 | X | X | X | 100 | 02 | 02 | 100 | 01 | 01 | 00010 | 01 | 01 | 0100 |
Purchasing proc.time | SMRPG | MPOP | PlOrd | Fr. | SelID | D | W | M | P |
00 | 001 | 050 | 500 | 001 | 01 | X | X | X |
|
00 | 001 | 050 | 500 | 001 | 01 | X | X | X |
|
00 | 001 | 050 | 500 | 001 | 01 | X | X | X |
|
PrOrd | SOb | DPr | C | * | A | M | T | QMInL | B | A |
X | X | 3 | E | U | U | X | X | X | X | D |
X | X | 3 | E | U | U | X | X | X | X | D |
X | X | 3 | E | U | U | X | X | X | X | D |
ChR | Type | SNot. | ChR | L | P | S | Q |
PP | YB03 | X | BO |
| X | X | X |
PP | YB03 | X | BO |
| X | X | X |
PP | YB03 | X | BO |
| X | X | X |
P | P | R | NR | OTyp | Simulative planned orders |
X | X | X | 01 | YB02 | 01 |
X | X | X | 01 | YB02 | 01 |
X | X | X | 01 | YB02 | 01 |
Promotion period | No.rangeTot. reqs | Include restricted-use stock |
000 | 01 | X |
000 | 01 | X |
000 | 01 | X |
APOrd | SN |
X | X |
X | X |
X | X |
7. Choose 8. On the screen, choose the button.
9. Make the following entries:
Plnt | SMKey | Op.Pd | Float after pro. | FloatBefProd. | Release period |
BP01 | 000 | 000 | 000 | 000 | 000 |
BP01 | 001 | 010 | 001 | 002 | 005 |
BP02 | 000 | 000 | 000 | 000 | 000 |
BP02 | 001 | 010 | 001 | 002 | 005 |
BP03 | 000 | 000 | 000 | 000 | 000 |
12. Make the following entries:
Plnt | SPT | R | Sp.proc. | Plnt | Direct productn | Phantom item |
BP01 | 10 | F | 2 |
|
|
|
BP01 | 20 | F | 0 |
|
|
|
BP01 | 30 | F | 3 |
|
|
|
BP01 | 40 | F | 7 |
|
|
|
BP01 | 45 | F | 7 | BP01 |
|
|
BP01 | 50 | E | E |
|
| X |
BP01 | 52 | E | E |
| X |
|
BP01 | 60 | E | E |
|
|
|
BP01 | 70 | E | E |
|
|
|
BP01 | 80 | E | P |
|
|
|
BP02 | 10 | F | 2 |
|
|
|
BP02 | 20 | F | 0 |
|
|
|
BP02 | 30 | F | 3 |
|
|
|
BP02 | 40 | F | 7 |
|
|
|
BP02 | 45 | F | 7 | BP02 |
|
|
BP02 | 50 | E | E |
|
| X |
BP02 | 52 | E | E |
| X |
|
BP02 | 60 | E | E |
|
|
|
BP02 | 70 | E | E |
|
|
|
BP02 | 80 | E | P |
|
|
|
BP03 | 10 | F | 2 |
|
|
|
BP03 | 20 | F | 0 |
|
|
|
BP03 | 30 | F | 3 |
|
|
|
BP03 | 40 | F | 7 |
|
|
|
BP03 | 45 | F | 7 | BP03 |
|
|
BP03 | 50 | E | E |
|
| X |
BP03 | 52 | E | E |
| X |
|
BP03 | 60 | E | E |
|
|
|
BP03 | 70 | E | E |
|
|
|
13. Choose 14. On the screen, choose the button.
15. Make the following entries:
Plnt | SPT | Long Text |
BP01 | 10 | Consignment |
BP01 | 20 | External procurement |
BP01 | 30 | Subcontracting |
BP01 | 40 | Stock transfer (proc.from alter.plant) |
BP01 | 45 | Stock transfer from plant to MRP area |
BP01 | 50 | Phantom assembly |
BP01 | 52 | Direct production / collective order |
BP01 | 60 | Phantom in planning |
BP01 | 70 | Withdrawal from alternative plant |
BP01 | 80 | Production in alternative plant |
BP02 | 10 | Consignment |
BP02 | 20 | External procurement |
BP02 | 30 | Subcontracting |
BP02 | 40 | Stock transfer (proc.from alter.plant) |
BP02 | 45 | Stock transfer from plant to MRP area |
BP02 | 50 | Phantom assembly |
BP02 | 52 | Direct production / collective order |
BP02 | 60 | Phantom in planning |
BP02 | 70 | Withdrawal from alternative plant |
BP02 | 80 | Production in alternative plant |
BP03 | 10 | Consignment |
BP03 | 20 | External procurement |
BP03 | 30 | Subcontracting |
BP03 | 40 | Stock transfer (proc.from alter.plant) |
BP03 | 45 | Stock transfer from plant to MRP area |
BP03 | 50 | Phantom assembly |
BP03 | 52 | Direct production / collective order |
BP03 | 60 | Phantom in planning |
BP03 | 70 | Withdrawal from alternative plant |
BP03 | 80 | Production in alternative plant |
16. Choose
17. On the screen, choose the button.
18. Make the following entries:
Plnt | OG | OrdT | PrCtr | Sch.H det. | SD | Sch | Cap | Sch.H | Sch.H |
BP01 | 2 | * | * | 000 | 01 | X | X | 000 | 000 |
BP01 | 2 | PE | * | 000 | 01 |
|
| 000 | 000 |
BP01 | 3 | PP01 | * | 000 |
| X |
| 000 | 000 |
BP01 | 3 | PP02 | * | 000 |
| X |
| 000 | 000 |
BP01 | 3 | PP04 | * | 000 |
| X |
| 000 | 000 |
BP01 | 3 | PPC1 | * | 000 |
| X |
| 000 | 000 |
BP01 | 3 | PPK1 | * | 000 |
| X |
| 000 | 000 |
BP01 | 4 | YPS4 | * | 000 |
|
|
| 000 | 000 |
BP02 | 2 | * | * | 000 | 01 | X | X | 000 | 000 |
BP02 | 2 | PE | * | 000 | 01 |
|
| 000 | 000 |
BP02 | 3 | PI01 | * | 000 |
| X |
| 000 | 000 |
BP02 | 3 | PI02 | * | 000 |
| X |
| 000 | 000 |
BP02 | 3 | PI04 | * | 000 |
| X |
| 000 | 000 |
BP03 | 2 | * | * | 000 | 01 | X | X | 000 | 000 |
BP03 | 2 | PE | * | 000 | 01 |
|
| 000 | 000 |
BP03 | 3 | PI01 | * | 000 |
| X |
| 000 | 000 |
BP03 | 3 | PI02 | * | 000 |
| X |
| 000 | 000 |
BP03 | 3 | PI04 | * | 000 |
| X |
| 000 | 000 |
Rate. horzn
SR
Sch
Cap
RcutPlgHor.
SR
SchedLvlBD
Adj.dates
000
02
000
03
000
02
X
X
000
03
1
2
000
000
000
000
000
000
000
000
2
000
000
000
000
000
02
000
03
000
02
X
X
000
03
1
2
000
000
000
000
000
000
000
02
000
03
000
02
X
X
000
03
1
2
000
000
000
000
000
000
ST
S
L
SiP
RL
%RF
%RF
%RF
%RF
%RF
%RF
2
000
0
0
0
0
0
0
0
2
000
0
0
0
0
0
0
0
2
X
000
0
0
0
0
0
0
0
2
X
000
0
0
0
0
0
0
0
2
X
000
0
0
0
0
0
0
0
3
000
0
0
0
0
0
0
0
1
X
000
0
0
0
0
0
0
0
2
000
0
0
0
0
0
0
0
2
000
0
0
0
0
0
0
0
2
000
0
0
0
0
0
0
0
1
X
000
0
0
0
0
0
0
0
1
X
000
0
0
0
0
0
0
0
2
X
000
0
0
0
0
0
0
0
2
000
0
0
0
0
0
0
0
2
000
0
0
0
0
0
0
0
1
X
000
0
0
0
0
0
0
0
1
X
000
0
0
0
0
0
0
0
2
X
000
0
0
0
0
0
0
0
Carry Out Overall Maintenance of MRP Groups
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OPPQ |
IMG Menu | Production à Material Requirements Planning à MRP Groups à Carry Out Overall Maintenance of MRP Groups à Maintain |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | MRP | Resch | PTF | PlHor | AvSS | SL | DPr |
BP01 | 0000 | 000 | 000 | 000 | 000 |
|
|
BP01 | 0001 | 000 | 000 | 000 | 000 |
|
|
BP01 | 0002 | 000 | 000 | 000 | 000 |
|
|
BP02 | 0000 | 000 | 000 | 000 | 000 |
|
|
BP02 | 0001 | 000 | 000 | 000 | 000 |
|
|
BP02 | 0002 | 000 | 000 | 000 | 000 |
|
|
BP03 | 0000 | 000 | 000 | 000 | 000 |
|
|
BP03 | 0001 | 000 | 000 | 000 | 000 |
|
|
BP03 | 0002 | 000 | 000 | 000 | 000 |
|
|
BP01 | 0010 | 100 | 000 | 100 | 100 | 2 | 3 |
BP01 | 0040 | 100 | 000 | 100 | 100 | 2 | 3 |
BP01 | 0052 | 100 | 000 | 100 | 100 | 2 | 3 |
Tval. | TolVa | ChR | Consumption mode | Bwd cons. per. | Fwd cons.period | SG | RollF |
00 | 00 |
|
| 000 | 000 |
| 0 |
00 | 00 |
|
| 000 | 000 |
| 0 |
00 | 00 |
| 2 | 030 | 002 |
| 0 |
00 | 00 |
|
| 000 | 000 |
| 0 |
00 | 00 |
|
| 000 | 000 |
| 0 |
00 | 00 |
| 2 | 030 | 002 |
| 0 |
00 | 00 |
|
| 000 | 000 |
| 0 |
00 | 00 |
|
| 000 | 000 |
| 0 |
00 | 00 |
| 2 | 030 | 002 |
| 0 |
02 | 02 | PP | 2 | 030 | 002 | 10 | 0 |
02 | 02 | PP | 2 | 030 | 002 | 40 | 0 |
02 | 02 | PP | 2 | 030 | 002 | 52 | 0 |
Int. | Type | OTyp | ISLoc | Adj.in.req | Adjust.per.for ind.reqs | SafetyTime | SafetyTime | AC |
0 |
|
|
|
| 0 |
| 00 |
|
0 |
|
|
|
| 0 |
| 00 |
|
0 |
|
|
|
| 0 |
| 00 |
|
0 |
|
|
|
| 0 |
| 00 |
|
0 |
|
|
|
| 0 |
| 00 |
|
0 |
|
|
|
| 0 |
| 00 |
|
0 |
|
|
|
| 0 |
| 00 |
|
0 |
|
|
|
| 0 |
| 00 |
|
0 |
|
|
|
| 0 |
| 00 |
|
0 |
| PI01 |
|
| 0 |
| 00 |
|
0 |
| PI01 |
|
| 0 |
| 00 |
|
0 |
| PI01 |
|
| 0 |
| 00 |
|
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | SPRO |
IMG Menu | Production à Material Requirements Planning à Planning à MRP Calculation à Stocks à Define Availability of Stock in Transfer/Blocked Stock/Restricted Stock |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | Stock in transfer | Blocked Stock | Include restricted-use stock |
BP01 | X | X | X |
BP02 | X | X | X |
BP03 | X | X | X |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OMDW |
IMG Menu | Production à Material Requirements Planning à Planning à MRP Calculation à Define Rescheduling Check à Plant |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | FrmPO | Fm.PR | OrdIt | Resch | Tval. | TolVa | QMInL | PrOrd | SNot. |
BP01 | X | X | X | 100 | 02 | 02 | X | X | X |
BP02 | X | X | X | 100 | 02 | 02 | X | X | X |
BP03 | X | X | X | 100 | 02 | 02 | X | X | X |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | SPRO |
IMG Menu | Production à Material Requirements Planning à Planning à MRP Calculation à Define Error Processing in the Planning Run |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | MPOP | SMRPG |
BP01 | 050 | 001 |
BP02 | 050 | 001 |
BP03 | 050 | 001 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | SPRO |
IMG Menu | Production à Material Requirements Planning à Planning à MRP Calculation à Define Range of Coverage Profile (Dynamic Safety Stock) |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | Prof. | Name 1 | Per. | NoPe | Type | NDay | TRC1 | RoC1 | TRC2 | RoC2 | TRC3 | Min1 |
BP01 | 001 |
| M | 03 | 1 | 00 | 03 | 01 | 05 | 00 | 00 | 00 |
BP02 | 001 |
| M | 03 | 1 | 00 | 03 | 01 | 05 | 00 | 00 | 00 |
BP03 | 001 |
| M | 03 | 1 | 00 | 03 | 01 | 05 | 00 | 00 | 00 |
Min2 | Min3 | Max1 | Max2 | MaxCv | LA | Name |
00 | 00 | 00 | 00 | 00 | EN | 3 days in the next month, then 5 days |
00 | 00 | 00 | 00 | 00 | EN | 3 days in the next month, then 5 days |
00 | 00 | 00 | 00 | 00 | EN | 3 days in the next month, then 5 days |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OMI4 |
IMG Menu | Production à Material Requirements Planning à Planning à Lot-Size Calculation à Check Lot-Sizing Procedure |
2. On the screen, choose the button.
3. Make the following entries:
LS | LS | LI | Pds | Description EN | Description ZH | Sched | Ovlpg | Number of periods |
DY | O | D | 0 | Dynamic lot size creation | 动态批量创建 |
|
| 0 |
EX | S | E | 0 | Lot-for-lot order quantity | 直接按批订货量 |
|
| 0 |
FS | S | S | 0 | Fixing and splitting | 固定和分解 |
| + | 0 |
FX | S | F | 0 | Fixed order quantity | 固定订单数量 |
|
| 0 |
GR | O | G | 0 | Groff reorder procedure | Groff重订货程序 |
|
| 0 |
HB | S | H | 0 | Replenish to maximum stock level | 补充到最大库存水平 |
|
| 0 |
MB | P | M | 1 | Monthly lot size | 月批量 | 1 |
| 0 |
PB | P | P | 1 | Period lot size = posting period | 期间批量 = 记帐期间 |
|
| 0 |
PK | P | K | 1 | Period lot size acc. to plng calendar | 根据计划日历的期间批量 |
|
| 0 |
SP | O | S | 0 | Part period balancing | 部分期间余额 |
|
| 0 |
TB | P | T | 1 | Daily lot size | 日批量 |
|
| 0 |
W2 | P | W | 1 | Week – 2 | 周 - 2 | 3 |
| 0 |
WB | P | W | 1 | Weekly lot size | 周批量 |
|
| 0 |
WI | O | W | 0 | Least unit cost procedure |
|
|
| 0 |
4. On the screen, choose the button.
5. Make the following entries:
Plant | Storage costs indicator | SC(%) |
BP01 | 1 | 10,00 |
BP02 | 1 | 10,00 |
BP03 | 1 | 10,00 |
BP0X | 1 | 10,00 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OMDT |
IMG Menu | Production à Material Requirements Planning à Planning à Procurement Proposals à Define External Procurement |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | Purchasing proc.time | Sob | * |
BP01 | 00 | X | U |
BP02 | 00 | X | U |
BP03 | 00 | X | U |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | SPRO |
IMG Menu | Production à Material Requirements Planning à Planning à Procurement Proposals à Define Line Item Numbers |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | ItPRq | ISTRe |
BP01 | 00010 | 0100 |
BP02 | 00010 | 0100 |
BP03 | 00010 | 0100 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | SPRO |
IMG Menu | Production à Material Requirements Planning à Planning à BOM Explosion/Routing Determination à Define BOM and Routing Selection |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | SelID |
BP01 | 01 |
BP02 | 01 |
BP03 | 01 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OPPE |
IMG Menu | Production à Material Requirements Planning à Procurement Proposals à Conversion of Procurement Proposals à Define Order Type for Conversion to Production/Process Order à Plant |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | Type | OTyp |
BP01 | PP01 | PI01 |
BP02 | PP01 | PI01 |
BP03 | PP01 | PI01 |
BP0X | PP01 | PI01 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OMDV |
IMG Menu | Production à Material Requirements Planning à Procurement Proposals à Conversion of Procurement Proposals à Define Conversion of Planned Orders into Purchase Requisitions |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | PlOrd |
BP01 | 500 |
BP02 | 500 |
BP03 | 500 |
BP0X | 500 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OMDV |
IMG Menu | Production à Material Requirements Planning à Procurement Proposals à Conversion of Procurement Proposals à Define Conversion of Planned Orders into Purchase Requisitions |
2. On the screen, choose the button.
3. Make the following entries:
Object type | ItPRq |
2 | 00010 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OMDU |
IMG Menu | Production à Material Requirements Planning à Planning File Entries à Activate MRP and Set Up Planning File |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | RP |
BP01 | X |
BP02 | X |
BP03 | X |
BP0X | X |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | SPRO |
IMG Menu | Production à Material Requirements Planning à Evaluation à Define Receipt Elements for Receipt Days’ Supply |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | P | S | Q | P | P | R | APOrd | SN |
BP01 | X | X | X | X | X | X | X | X |
BP02 | X | X | X | X | X | X | X | X |
BP03 | X | X | X | X | X | X | X | X |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP) |
Transaction Code | OPU5 |
IMG Menu | Production à Capacity Requirements Planning à Operations à Scheduling à Repetitive Manufacturing à Planning à Material Requirements Planning à Planning à Scheduling and Capacity Parameters à IMG Activities à Define scheduling parameters for planned orders |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | OG | OrdT | PrCtr | Sch.H det. | SD | Sch | Cap |
BP01 | 2 | * | * | 000 | 01 | X | X |
BP01 | 2 | PE | * | 000 | 01 |
|
|
BP02 | 2 | * | * | 000 | 01 | X | X |
BP02 | 2 | PE | * | 000 | 01 |
|
|
BP03 | 2 | * | * | 000 | 01 | X | X |
BP03 | 2 | PE | * | 000 | 01 |
|
|
Plnt | Sch.H | Sch.H | Rate. horzn | SR | Sch | Cap | RCutPlgHor. | SR |
BP01 | 000 | 000 | 000 | 02 |
|
| 000 | 03 |
BP01 | 000 | 000 | 000 | 02 | X | X | 000 | 03 |
BP02 | 000 | 000 | 000 | 02 |
|
| 000 | 03 |
BP02 | 000 | 000 | 000 | 02 | X | X | 000 | 03 |
BP03 | 000 | 000 | 000 | 02 |
|
| 000 | 03 |
BP03 | 000 | 000 | 000 | 02 | X | X | 000 | 03 |
Plnt | SchedLvlBD | Adj.dates | ST | SiP |
BP01 |
|
| 2 | 000 |
BP01 | 1 | 2 | 2 | 000 |
BP02 |
|
| 2 | 000 |
BP02 | 1 | 2 | 2 | 000 |
BP03 |
|
| 2 | 000 |
BP03 | 1 | 2 | 2 | 000 |
Plnt | RL | %RF | %RF | %RF | %RF | %RF | %RF |
BP01 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BP01 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BP02 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BP02 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BP03 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
BP03 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
6. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC) |
Transaction Code | OPEB |
IMG Menu | Production à Basic Data à Routing à Routing Selection à Select Automatically |
7. On the screen, choose the button.
8. Make the following entries:
ID | SP | TLType | Usage | Description EN | Description ZH | Stat | Description of the status |
1 | 1 | N | 1 | Production | 生产 | 4 | Released (general) |
1 | 2 | N | 1 | Production | 生产 | 2 | Released for order |
1 | 3 | 2 | 1 | Production | 生产 | 4 | Released (general) |
1 | 4 | 2 | 1 | Production | 生产 | 2 | Released for order |
1 | 5 | R | 1 | Production | 生产 | 4 | Released (general) |
1 | 6 | R | 1 | Production | 生产 | 2 | Released for order |
2 | 1 | R | 1 | Production | 生产 | 4 | Released (general) |
2 | 2 | R | 1 | Production | 生产 | 2 | Released for order |
3 | 1 | 3 | 1 | Production | 生产 | 4 | Released (general) |
3 | 2 | 3 | 1 | Production | 生产 | 2 | Released for order |
4 | 1 | 2 | 1 | Production | 生产 | 4 | Released (general) |
4 | 2 | 2 | 1 | Production | 生产 | 2 | Released for order |
Q1 | 1 | Q | 1 | Production | 生产 | 4 | Released (general) |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC) |
Transaction Code | OP7B |
IMG Menu | Production à Master Data à Work Centerà General Data à Standard Value à Define Parameters |
2. On the screen, choose the button.
3. Make the following entries:
Parameter | Origin | Short Key Word | Key Word EN | Key Word ZH | Dimension | Standard Value | Standard Value Unit | Field Name |
YB_001 | 1 |
| BP Max. Capacity in KG | BP KG 最大能力 | MASS | 0 | KG |
|
YB_002 | 1 |
| BP Max. Capacity in PC | BP PC 最大能力 | AAAADL | 0 | ST |
|
YB_101 | 2 |
| BP Dur. Ress./Batch | BP 批量预定 | TIME | 0 | H |
|
YB_102 | 2 |
| BP Dur. Pers./Batch | BP 批量人工 | TIME | 0 | H |
|
YB_103 | 2 |
| BP Setup per Operation | BP 工序准备 | TIME | 0 | H |
|
YB_104 | 2 |
| BP Setup per Batch | BP 批量准备 | TIME | 0 | H |
|
YB_105 | 2 |
| BP Clean. per Operation | BP 工序清洁 | TIME | 0 | H |
|
YB_106 | 2 |
| BP Clean. per Batch | BP 批量清洁 | TIME | 0 | H |
|
YB_107 | 2 |
| BP Function Clock | BP 职能时钟 | TIME | 0 | H |
|
YB_108 | 2 |
| BP Process Flow Rate | BP 工序流率 | TIME | 0 | H |
|
YB_109 | 2 |
| BP Labor | BP 人工时间 | TIME | 0 | MIN |
|
YB_110 | 2 | Overhead | BP Overhead | BP 费用时间 | TIME | 0 | H |
|
YB_112 | 2 | Energy | BP Energy | BP 能量 | ENERGY | 0 | KWH |
|
SAP_01 | 2 | Setup | Setup | 准备 | TIME | 0 | MIN |
|
SAP_02 | 2 | Machine | Machine | 机器 | TIME | 0 | MIN |
|
SAP_03 | 2 | Labor | Labor | 工时 | TIME | 0 | MIN |
|
SAP_04 | 2 | Op time 1 | Standard value 1 | 标准值 1 | TIME | 0 | MIN |
|
SAP_05 | 2 | Op time 2 | Standard value 2 | 标准值 2 | TIME | 0 | MIN |
|
SAP_06 | 2 | Op time 3 | Standard value 3 | 标准值 3 | TIME | 0 | MIN |
|
SAP_07 |
| Work | Work (internal proc) | 工作 (内部加工) |
| 0 |
| ARBEI |
SAP_08 |
| Base qty | Base quantity | 基本数量 |
| 1 |
| BMSCH |
SAP_09 |
| Op. qty. | Operation quantity | 工序数量 |
| 1 |
| MGVRG |
SAP_10 |
| Duration | Other formula | 其它公式 | TIME | 0 | MIN | DAUNO |
SAP_11 |
| Splits | Operation splits | 工序分解 |
| 1 |
| SPLIM |
SAP_12 | 6 | PRT par. 1 | PRT parameter 1 | PRT 参数 1 | AAAADL | 1 | LE |
|
SAP_13 | 6 | PRT par. 2 | PRT parameter 2 | PRT 参数 2 | AAAADL | 1 | LE |
|
SAP_14 | 4 | User field | User field | 用户字段 | AAAADL | 1 | ST |
|
SAP_16 | 5 | PRT value | PRT std value | PRT 标准值 |
| 1 |
| EWVGW |
SAP_17 |
| Number of | Number of employees | 员工数 |
| 5 |
| ANZMA |
SAP_55 | 1 | Time | Res. dep. duration | 限制开发期 | TIME | 1 | H |
|
YB_113 | 2 | Machine | BP Machining Time | BP 机器时间 | TIME | 0 | MIN |
|
YB_114 |
| Op. qty. | Operation quantity | BP 工序数量 |
| 1 |
| MGVRG |
YB_115 |
| Base qty | Base quantity | BP 基本数量 |
| 1 |
| BMSCH |
YB_116 |
| Splits | Operation splits | BP 工序分解 |
| 1 |
| SPLIM |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC) |
Transaction Code | OP19 |
IMG Menu | Production Planning for Process Industries à Master Data à Resource à General Data à Standard Value à Define Standard Value Key |
2. On the screen, choose the button.
3. Make the following entries:
SVK | Text EN | Text ZH | Params. | Params. | Params. | Params. | Params. | Params. |
YB01 | BP: Batch M/P + Setup/Cleaning | BP 批量生产及准备 | YB_103 | YB_101 | YB_102 | YB_105 | YB_110 |
|
YB02 | BP: Cont. M/P + Setup/Cleaning | BP 连续生产及准备 | YB_103 | YB_107 | YB_108 | YB_109 | YB_105 | YB_110 |
YB03 | Process Manufacturing Energy | BP 流程式制造能量 | YB_112 |
|
|
|
|
|
YB04 | BP Normal production | BP 常规生产 | YB_103 | YB_113 | YB_109 |
|
|
|
SAP0 | No standard values | 无标准值 |
|
|
|
|
|
|
SAP1 | Normal production | 常规生产 | SAP_01 | SAP_02 | SAP_03 |
|
|
|
SAP2 | Variable production | 可变化的生产 | SAP_01 | SAP_02 | SAP_03 | SAP_04 | SAP_05 | SAP_06 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC) |
Transaction Code | SPRO |
IMG Menu | Production à Basic Data à Work Center à General Data à Determine Person Responsible |
2. On the screen, choose .
3. Make the following entries:
Plnt | Res | Name | Name |
BP01 | 001 | Person Responsible 001 | 工作中心负责人001 |
BP01 | A | Person Responsible A | 工作中心负责人A |
BP02 | 001 | Person Responsible 001 | 工作中心负责人001 |
BP02 | A | Person Responsible A | 工作中心负责人A |
BP03 | 001 | Person Responsible 001 | 工作中心负责人001 |
BP03 | A | Person Responsible A | 工作中心负责人A |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC) |
Transaction Code | OP54 |
IMG Menu | Production à Master Data à Work Centerà Costing à Define formulas for work centers |
2. On the screen, choose the button.
3. Make the following entries:
Formula Key | Text EN | Text ZH | Formula | Generate | Allowed for Costing | Work Center for req. | Allowed for sched. |
YB_001 | M: Reqmt with YB | BP M 需求时间 | ( SAP_09 DIV ( SAP_08 ) + 1 ) * YB_101 | | | |
|
YB_002 | PP: Reqmt with YB01 | BP P 需求时间 | ( SAP_09 DIV ( SAP_08 ) + 1 ) * YB_102 | | | |
|
YB_003 | M: Duration YB01 | BP M 过程 | YB_103 + ( ( SAP_09 DIV ( SAP_08 ) + 1 ) * YB_101 ) + YB_105 | |
|
| |
YB_004 | P: Duration YB01 | BP P 过程 | YB_103 + ( ( SAP_09 DIV ( SAP_08 ) + 1 ) * YB_102 ) + YB_105 | |
|
| |
YB_005 | M: Reqmt setup | BP M 准备 | YB_103 | | | |
|
YB_006 | P: Reqmt cleanout | BP P 清洁时间 | YB_105 | | | |
|
YB_007 | M: Reqmt with YB02 | BP P 需求时间 | YB_108 + ( YB_107 * SAP_09 / SAP_08 ) | | | |
|
YB_008 | P: Reqmt with YB02 | BP P 需求时间 | YB_109 + ( YB_107 * SAP_09 / SAP_08 ) | | | |
|
YB_009 | M: Duration YB02 | BP M 需求时间 | YB_103 + YB_108 + ( YB_107 * SAP_09 / SAP_08 ) + YB_105 | |
|
| |
YB_010 | Duration YB02 | BP 过程 | YB_103 + YB_109 + ( YB_107 * SAP_09 / SAP_08 ) + YB_105 | |
|
| |
YB_011 | Energy | BP 能量 | ( ( ( SAP_09 / SAP_08 ) + 1 ) * YB_112 ) | | | |
|
SAP001 | Prod.: Setup time | 生产: 准备时间 | SAP_01 | | |
| |
SAP002 | Prod.: Machine time | 生产: 机时 | SAP_02 * SAP_09 / SAP_08 / SAP_11 | | |
| |
SAP003 | Prod.: Labor time | 生产: 工时 | SAP_03 * SAP_09 / SAP_08 / SAP_11 | | |
| |
SAP004 | Proj:Netw/Maint.Time | 预测: 内部加工时间 | SAP_10 | | |
| |
SAP005 | Prod: Setup rqmts | 生产:准备需求 | SAP_01 * SAP_11 | | | |
|
SAP006 | Prod.: Machine rqmts | 生产:机器需求 | SAP_02 * SAP_09 / SAP_08 | | | |
|
SAP007 | Prod.: Labor rqmts | 生产:工时需求 | SAP_03 * SAP_09 / SAP_08 | | | |
|
SAP008 | Proj:RqmtsNetwkMaint | 生产: 内部加工需求 | SAP_07 | | | |
|
YB_012 | BP Setup time | BP 准备时间 | YB_103 | | | | |
YB_013 | BP Machine time | BP 机时 | YB_113 * YB_114 / YB_115 / YB_116 | | | | |
YB_014 | BP Labor time | BP 工时 | YB_109 * YB_114 / YB_115 / YB_116 | | | | |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC) |
Transaction Code | OPJ8 |
IMG Menu | Production ® Shop Floor Control ® Master Data ® Routing Data ® Define Control Keys |
2. On the screen, choose the button.
3. Make the following entries:
Control Key | Description EN | Description ZH | Scheduling | Det. Cap. Requirements | Insp. Char. required | Aut. Goods receipt | Cost |
YB01 | BP Process Manufacturing | BP 流程式制造 | X | X |
|
| X |
YB02 | BP Process Manufacturing with inspection | BP 具有检验功能的流程式制造 | X | X | X |
| X |
YB03 | BP Process manuf. with autom. goods receipt | BP 具有自动货物接收功能的流程式制造 | X | X |
| X | X |
YB04 | BP Process Manufacturing with autom. GR(HU) | BP 工艺路线/参照工序集 - 内部加工 | X | X |
|
| X |
YB05 | BP Routing/Ref. op. set - external proc. | BP 工艺路线/参照工序集 - 外部加工 | X |
|
|
| X |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC) |
Transaction Code | SPRO |
IMG Menu | Production à Shop Floor Control à Operations à Scheduling à Define Scheduling Margin Key |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | SMKey | Op.Pd | Float after pro. | FloatBefProd. | Release period |
BP01 | 000 | 000 | 000 | 000 | 000 |
BP01 | 001 | 010 | 001 | 002 | 005 |
BP02 | 000 | 000 | 000 | 000 | 000 |
BP02 | 001 | 010 | 001 | 002 | 005 |
BP03 | 000 | 000 | 000 | 000 | 000 |
BP03 | 001 | 010 | 001 | 002 | 005 |
1. To carry out the activity, choose one of the following navigation options:
SAP <System> | User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC) |
Transaction Code | OPK5 |
IMG Menu | Production à Shop Floor Control à Operations à Confirmation à Define Reasons for Variances |
2. On the screen, choose the button.
3. Make the following entries:
Plnt | Cause | LA | Description EN | Description ZH |
BP01 | 0001 | EN | Machine malfunction | BP 机器故障 工厂BP01 |
BP01 | 0002 | EN | Operating error | BP 操作错误 工厂BP01 |
BP01 | 0003 | EN | Defective material | BP 有缺陷物料 工厂BP01 |
BP02 | 0001 | EN | Machine malfunction | BP 机器故障 工厂BP02 |
BP02 | 0002 | EN | Operating error | BP 操作错误 工厂BP02 |
BP02 | 0003 | EN | Defective material | BP 有缺陷物料 工厂BP02 |
BP03 | 0001 | EN | Machine malfunction | BP 机器故障 工厂BP03 |
BP03 | 0002 | EN | Operating error | BP 操作错误 工厂BP03 |
BP03 | 0003 | EN | Defective material | BP 有缺陷物料 工厂BP03 |