Production Planning and Controlling (J06)

 

 

 

 

 

 

 

 

 

SAP AG
Neurottstr. 16
69190 Walldorf
Germany

Building Block Configuration Guide


Copyright

 

Icons

 

Icon

Meaning

Caution

Example

Note or Tip

Recommendation

Syntax

 

 

 

Type Style

Description

Example text

Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.

Cross-references to other documentation.

Example text

Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT

Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.

Example text

Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.

EXAMPLE TEXT

Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.

Example text

Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.

<Example text>

Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.

 

Contents

              6

              6

              6

              6

                            6

              7

                            7

                            7

                            7

                            7

                            8

                            10

                            11

                            17

                            18

                            19

                            19

                            20

                            21

              22

                            23

                            23

                            24

                            24

                            25

                            26

                            26

                            27

                            28

                            28

                            29

                            31

                            32

                            33

                            35

                            36

                            36

J06 – Production Planning and Controlling: Configuration Guide

1        Purpose

The purpose of this document is to describe the general configuration steps required to manually set up the configuration within the system landscape that has already been installed using the corresponding installation or configuration guides for installation.

The Building Block Configuration Guide describes how to set up the configuration of a building block manually, without the support of automated configuration tools. If you want to use BC Sets, LSMW, ECATT and CATT procedures for an automated installation process, refer to the Building Block Installation Guide of this building block

2        Preparation

2.1    Prerequisites

List dependencies with other building blocks and describe the general prerequisites that you have to fulfill to install this building block. Do not repeat preparation settings already described in other building block guides.

2.2    Uploading the Configuration Role

configuration role and assign it to your user.

This building block provides a configuration role for each SAP component that is involved in its configuration, such as SAP APO; SAP R/3, or SAP CRM. The configuration role enables you to comfortably access all transactions required for the configuration from the relevant system. The following roles are available:

Technical name

Description

File name for upload

/SMB12/J06_01I

J06 Production Planning

_SMB12_J06_01I.SAP

Essential Information.

 

3        Configuration

3.1    Sales and Operation Planning

3.1.1                Set Planning Plant for SOP

1.       To carry out the activity, choose one of the following navigation options:

SAP <System>
Role Menu

User menu à J06 Production Planning à Installation à /SMB12/S300_J06_01 - Sales & Operations Planning (SOP)

Transaction Code

SPRO

IMG Menu

Production à Sales & Operation Planning (SOP) à Master Data à Set Planning Plant for SOPà Maintain SOP Planning Plant

2.       On the screen, choose the button.

3.       Make the following entries:

Plnt

Plnt

BP01

X

BP02

X

BP03

X

BP0X

X

  1. Choose Choose     Material Requirements Planning

    3.2.1                Define MRP Controller

    1.       To carry out the activity, choose one of the following navigation options:

    SAP <System>
    Role Menu

    User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

    Transaction Code

    SPRO

    IMG Menu

    Production à   Material Requirements Planning à Master Data à Define MRP Controllers           

    2.       On the screen, choose the button.

    3.       Make the following entries:

    Plnt

    MRPCn

    Name 1

    Name

    BP01

    工厂BP01

    001

    MRP控制者

    BP01

    工厂BP01

    Y01

    MRP控制者-成品

    BP01

    工厂BP01

    Y02

    MRP控制者-其他

    BP02

    工厂BP02

    001

    MRP控制者

    BP02

    工厂BP02

    Y01

    MRP控制者-成品

    BP02

    工厂BP02

    Y02

    MRP控制者-其他

    BP03

    工厂BP03

    001

    MRP控制者

    BP03

    工厂BP03

    Y01

    MRP控制者-成品

    BP03

    工厂BP03

    Y02

    MRP控制者-其他

    BP0X

    工厂BP0X

    001

    MRP控制者

    BP0X

    工厂BP0X

    Y01

    MRP控制者-成品

    BP0X

    工厂BP0X

    Y02

    MRP控制者-其他

                                                                    

    4.       Choose

  2. Choose

 

3.2.2                Special Procurement Type

1.       To carry out the activity, choose one of the following navigation options:

SAP <System>
Role Menu

User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

Transaction Code

SPRO

IMG Menu

Production à Material Requirements Planning à Master Data à Define Special Procurement Type

2.       On the screen, choose the button.

3.       Make the following entries:

Plnt

SP type

Long Text EN


Long Text ZH

Proc type

Sp.proc.

Plnt

Direct productn

Phantom item

BP01

10

BP Consignment

BP 外部采购-寄售

F

2

 

 

 

BP01

20

BP External procurement

BP 外部采购

F

0

 

 

 

BP01

30

BP Subcontracting

BP 外部采购-分包

F

3

 

 

 

BP01

40

BP Stk transf (proc.fr alter.plant)

BP 库存转换(来自可选工厂的产品)

F

7

BP02

 

 

BP01

45

BP Stk transf fr plant to MRP area

BP 库存从工厂到 MRP 范围

F

7

BP02

 

 

BP01

50

BP Phantom assembly

BP 虚无装配

E

E

 

 

X

BP01

52

BP Direct prodn / collective order

BP 直接生产/收集订单

E

E

 

X

 

BP01

60

BP Phantom in planning

BP 虚拟计划

E

E

 

 

 

BP01

70

BP Withdrawal from alternative plant

BP 从替代工厂领料

E

E

 

 

 

BP01

80

BP Production in alternative plant

BP 在替代工厂生产

E

P

BP02

 

 

BP02

10

BP Consignment

BP 外部采购-寄售

F

2

 

 

 

BP02

20

BP External procurement

BP 外部采购

F

0

 

 

 

BP02

30

BP Subcontracting

BP 外部采购-分包

F

3

 

 

 

BP02

40

BP Stk transf (proc.fr alter.plant)

BP 库存转换(来自可选工厂的产品)

F

7

BP01

 

 

BP02

45

BP Stk transf fr plant to MRP area

BP 库存从工厂到 MRP 范围

F

7

BP01

 

 

BP02

50

BP Phantom assembly

BP 虚无装配

E

E

 

 

X

BP02

52

BP Direct prodn / collective order

BP 直接生产/收集订单

E

E

 

X

 

BP02

60

BP Phantom in planning

BP 虚拟计划

E

E

 

 

 

BP02

70

BP Withdrawal from alternative plant

BP 从替代工厂领料

E

E

 

 

 

BP02

80

BP Production in alternative plant

BP 在替代工厂生产

E

P

BP01

 

 

BP03

10

BP Consignment

BP 外部采购-寄售

F

2

 

 

 

BP03

20

BP External procurement

BP 外部采购

F

0

 

 

 

BP03

30

BP Subcontracting

BP 外部采购-分包

F

3

 

 

 

BP03

40

BP Stk transf (proc.fr alter.plant)

BP 库存转换(来自可选工厂的产品)

F

7

BP01

 

 

BP03

45

BP Stk transf fr plant to MRP area

BP 库存从工厂到 MRP 范围

F

7

BP01

 

 

BP03

50

BP Phantom assembly

BP 虚无装配

E

E

 

 

X

BP03

52

BP Direct prodn / collective order

BP 直接生产/收集订单

E

E

 

X

 

BP03

60

BP Phantom in planning

BP 虚拟计划

E

E

 

 

 

BP03

70

BP Withdrawal from alternative plant

BP 从替代工厂领料

E

E

 

 

 

BP03

80

BP Production in alternative plant

BP 在替代工厂生产

E

P

BP01

 

 

  1. Choose Choose                 Planning Horizon for Plant

    1.       To carry out the activity, choose one of the following navigation options:

    SAP <System>
    Role Menu

    User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

    Transaction Code

    OMDX

    IMG Menu

    Production à Material Requirements Planning à Planning à MRP Calculation à Define Planning Horizon à Plant

    2.       On the screen, choose the button.

    3.       Make the following entries:

    Plnt

    PlHor

    BP01

    100

    BP02

    100

    BP03

    100

    BP0X

    100

    1. Choose Choose                 Carry Out Overall Maintenance of Plant Parameters

      1.       To carry out the activity, choose one of the following navigation options:

      SAP <System>
      Role Menu

      User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

      Transaction Code

      OPPQ

      IMG Menu

      Production à  Material Requirements Planning à Plant Parameters à Carry Out Overall Maintenance of Plant Parameters à Maintain

      2.       On the screen, choose the button.

      3.       Make the following entries:

      Plnt

      MRPCn

      Name

      BP01

      001

      Disponent

      BP02

      001

      Disponent

      BP03

      001

      Disponent

      1. Choose 5.       On the screen, choose the button.

        6.       Make the following entries:

        Plnt

        FrmPO

        Fm.PR

        OrdIt

        Resch

        Tval.

        TolVa

        PlHor

        NR

        NR

        ItPRq

        NR

        NR

        ISTRe

        BP01

        X

        X

        X

        100

        02

        02

        100

        01

        01

        00010

        01

        01

        0100

        BP02

        X

        X

        X

        100

        02

        02

        100

        01

        01

        00010

        01

        01

        0100

        BP03

        X

        X

        X

        100

        02

        02

        100

        01

        01

        00010

        01

        01

        0100

         

        Purchasing proc.time

        SMRPG

        MPOP

        PlOrd

        Fr.

        SelID

        D

        W

        M

        P

        00

        001

        050

        500

        001

        01

        X

        X

        X

         

        00

        001

        050

        500

        001

        01

        X

        X

        X

         

        00

        001

        050

        500

        001

        01

        X

        X

        X

         

         

        PrOrd

        SOb

        DPr

        C

        *

        A

        M

        T

        QMInL

        B

        A

        X

        X

        3

        E

        U

        U

        X

        X

        X

        X

        D

        X

        X

        3

        E

        U

        U

        X

        X

        X

        X

        D

        X

        X

        3

        E

        U

        U

        X

        X

        X

        X

        D

         

        ChR

        Type

        SNot.

        ChR

        L

        P

        S

        Q

        PP

        YB03

        X

        BO

         

        X

        X

        X

        PP

        YB03

        X

        BO

         

        X

        X

        X

        PP

        YB03

        X

        BO

         

        X

        X

        X

         

        P

        P

        R

        NR

        OTyp

        Simulative planned orders

        X

        X

        X

        01

        YB02

        01

        X

        X

        X

        01

        YB02

        01

        X

        X

        X

        01

        YB02

        01

         

        Promotion period

        No.rangeTot. reqs

        Include restricted-use stock

        000

        01

        X

        000

        01

        X

        000

        01

        X

         

        APOrd

        SN

        X

        X

        X

        X

        X

        X

         

        7.       Choose 8.       On the screen, choose the button.

        9.       Make the following entries:

        Plnt

        SMKey

        Op.Pd

        Float after pro.

        FloatBefProd.

        Release period

        BP01

        000

        000

        000

        000

        000

        BP01

        001

        010

        001

        002

        005

        BP02

        000

        000

        000

        000

        000

        BP02

        001

        010

        001

        002

        005

        BP03

        000

        000

        000

        000

        000

         

        1. Choose 11.   On the screen, choose the button.

          12.   Make the following entries:

          Plnt

          SPT

          R

          Sp.proc.

          Plnt

          Direct productn

          Phantom item

          BP01

          10

          F

          2

           

           

           

          BP01

          20

          F

          0

           

           

           

          BP01

          30

          F

          3

           

           

           

          BP01

          40

          F

          7

           

           

           

          BP01

          45

          F

          7

          BP01

           

           

          BP01

          50

          E

          E

           

           

          X

          BP01

          52

          E

          E

           

          X

           

          BP01

          60

          E

          E

           

           

           

          BP01

          70

          E

          E

           

           

           

          BP01

          80

          E

          P

           

           

           

          BP02

          10

          F

          2

           

           

           

          BP02

          20

          F

          0

           

           

           

          BP02

          30

          F

          3

           

           

           

          BP02

          40

          F

          7

           

           

           

          BP02

          45

          F

          7

          BP02

           

           

          BP02

          50

          E

          E

           

           

          X

          BP02

          52

          E

          E

           

          X

           

          BP02

          60

          E

          E

           

           

           

          BP02

          70

          E

          E

           

           

           

          BP02

          80

          E

          P

           

           

           

          BP03

          10

          F

          2

           

           

           

          BP03

          20

          F

          0

           

           

           

          BP03

          30

          F

          3

           

           

           

          BP03

          40

          F

          7

           

           

           

          BP03

          45

          F

          7

          BP03

           

           

          BP03

          50

          E

          E

           

           

          X

          BP03

          52

          E

          E

           

          X

           

          BP03

          60

          E

          E

           

           

           

          BP03

          70

          E

          E

           

           

           

          13.   Choose 14.   On the screen, choose the button.

          15.   Make the following entries:

          Plnt

          SPT

          Long Text

          BP01

          10

          Consignment

          BP01

          20

          External procurement

          BP01

          30

          Subcontracting

          BP01

          40

          Stock transfer (proc.from alter.plant)

          BP01

          45

          Stock transfer from plant to MRP area

          BP01

          50

          Phantom assembly

          BP01

          52

          Direct production / collective order

          BP01

          60

          Phantom in planning

          BP01

          70

          Withdrawal from alternative plant

          BP01

          80

          Production in alternative plant

          BP02

          10

          Consignment

          BP02

          20

          External procurement

          BP02

          30

          Subcontracting

          BP02

          40

          Stock transfer (proc.from alter.plant)

          BP02

          45

          Stock transfer from plant to MRP area

          BP02

          50

          Phantom assembly

          BP02

          52

          Direct production / collective order

          BP02

          60

          Phantom in planning

          BP02

          70

          Withdrawal from alternative plant

          BP02

          80

          Production in alternative plant

          BP03

          10

          Consignment

          BP03

          20

          External procurement

          BP03

          30

          Subcontracting

          BP03

          40

          Stock transfer (proc.from alter.plant)

          BP03

          45

          Stock transfer from plant to MRP area

          BP03

          50

          Phantom assembly

          BP03

          52

          Direct production / collective order

          BP03

          60

          Phantom in planning

          BP03

          70

          Withdrawal from alternative plant

          BP03

          80

          Production in alternative plant

           

          16.   Choose

          17.   On the screen, choose the button.

          18.   Make the following entries:

          Plnt

          OG

          OrdT

          PrCtr

          Sch.H det.

          SD

          Sch

          Cap

          Sch.H

          Sch.H

          BP01

          2

          *

          *

          000

          01

          X

          X

          000

          000

          BP01

          2

          PE

          *

          000

          01

           

           

          000

          000

          BP01

          3

          PP01

          *

          000

           

          X

           

          000

          000

          BP01

          3

          PP02

          *

          000

           

          X

           

          000

          000

          BP01

          3

          PP04

          *

          000

           

          X

           

          000

          000

          BP01

          3

          PPC1

          *

          000

           

          X

           

          000

          000

          BP01

          3

          PPK1

          *

          000

           

          X

           

          000

          000

          BP01

          4

          YPS4

          *

          000

           

           

           

          000

          000

          BP02

          2

          *

          *

          000

          01

          X

          X

          000

          000

          BP02

          2

          PE

          *

          000

          01

           

           

          000

          000

          BP02

          3

          PI01

          *

          000

           

          X

           

          000

          000

          BP02

          3

          PI02

          *

          000

           

          X

           

          000

          000

          BP02

          3

          PI04

          *

          000

           

          X

           

          000

          000

          BP03

          2

          *

          *

          000

          01

          X

          X

          000

          000

          BP03

          2

          PE

          *

          000

          01

           

           

          000

          000

          BP03

          3

          PI01

          *

          000

           

          X

           

          000

          000

          BP03

          3

          PI02

          *

          000

           

          X

           

          000

          000

          BP03

          3

          PI04

          *

          000

           

          X

           

          000

          000

          Rate. horzn

          SR

          Sch

          Cap

          RcutPlgHor.

          SR

          SchedLvlBD

          Adj.dates

          000

          02

           

           

          000

          03

           

           

          000

          02

          X

          X

          000

          03

          1

          2

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

          2

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

          02

           

           

          000

          03

           

           

          000

          02

          X

          X

          000

          03

          1

          2

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

          02

           

           

          000

          03

           

           

          000

          02

          X

          X

          000

          03

          1

          2

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          000

           

           

           

          ST

          S

          L

          SiP

          RL

          %RF

          %RF

          %RF

          %RF

          %RF

          %RF

          2

           

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

           

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

          3

           

           

          000

          0

          0

          0

          0

          0

          0

          0

          1

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

           

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

           

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

           

           

          000

          0

          0

          0

          0

          0

          0

          0

          1

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

          1

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

           

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

           

           

          000

          0

          0

          0

          0

          0

          0

          0

          1

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

          1

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

          2

          X

           

          000

          0

          0

          0

          0

          0

          0

          0

                          Carry Out Overall Maintenance of MRP Groups

          1.       To carry out the activity, choose one of the following navigation options:

          SAP <System>
          Role Menu

          User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

          Transaction Code

          OPPQ

          IMG Menu

          Production à Material Requirements Planning à MRP Groups à Carry Out Overall Maintenance of MRP Groups à Maintain

          2.       On the screen, choose the button.

          3.       Make the following entries:

          Plnt

          MRP

          Resch

          PTF

          PlHor

          AvSS

          SL

          DPr

          BP01

          0000

          000

          000

          000

          000

           

           

          BP01

          0001

          000

          000

          000

          000

           

           

          BP01

          0002

          000

          000

          000

          000

           

           

          BP02

          0000

          000

          000

          000

          000

           

           

          BP02

          0001

          000

          000

          000

          000

           

           

          BP02

          0002

          000

          000

          000

          000

           

           

          BP03

          0000

          000

          000

          000

          000

           

           

          BP03

          0001

          000

          000

          000

          000

           

           

          BP03

          0002

          000

          000

          000

          000

           

           

          BP01

          0010

          100

          000

          100

          100

          2

          3

          BP01

          0040

          100

          000

          100

          100

          2

          3

          BP01

          0052

          100

          000

          100

          100

          2

          3

           

          Tval.

          TolVa

          ChR

          Consumption mode

          Bwd cons. per.

          Fwd cons.period

          SG

          RollF

          00

          00

           

           

          000

          000

           

          0

          00

          00

           

           

          000

          000

           

          0

          00

          00

           

          2

          030

          002

           

          0

          00

          00

           

           

          000

          000

           

          0

          00

          00

           

           

          000

          000

           

          0

          00

          00

           

          2

          030

          002

           

          0

          00

          00

           

           

          000

          000

           

          0

          00

          00

           

           

          000

          000

           

          0

          00

          00

           

          2

          030

          002

           

          0

          02

          02

          PP

          2

          030

          002

          10

          0

          02

          02

          PP

          2

          030

          002

          40

          0

          02

          02

          PP

          2

          030

          002

          52

          0

           

          Int.

          Type

          OTyp

          ISLoc

          Adj.in.req

          Adjust.per.for ind.reqs

          SafetyTime

          SafetyTime

          AC

          0

           

           

           

           

          0

           

          00

           

          0

           

           

           

           

          0

           

          00

           

          0

           

           

           

           

          0

           

          00

           

          0

           

           

           

           

          0

           

          00

           

          0

           

           

           

           

          0

           

          00

           

          0

           

           

           

           

          0

           

          00

           

          0

           

           

           

           

          0

           

          00

           

          0

           

           

           

           

          0

           

          00

           

          0

           

           

           

           

          0

           

          00

           

          0

           

          PI01

           

           

          0

           

          00

           

          0

           

          PI01

           

           

          0

           

          00

           

          0

           

          PI01

           

           

          0

           

          00

           

           

           

          1. Choose Choose                 Define Availability of Stock

            1.       To carry out the activity, choose one of the following navigation options:

            SAP <System>
            Role Menu

            User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

            Transaction Code

            SPRO

            IMG Menu

            Production à Material Requirements Planning à Planning à MRP Calculation à Stocks à Define Availability of Stock in Transfer/Blocked Stock/Restricted Stock

            2.       On the screen, choose the button.

            3.       Make the following entries:

            Plnt

            Stock in transfer

            Blocked Stock

            Include restricted-use stock

            BP01

            X

            X

            X

            BP02

            X

            X

            X

            BP03

            X

            X

            X

            1. Choose Choose                 Define Rescheduling Check

              1.       To carry out the activity, choose one of the following navigation options:

              SAP <System>
              Role Menu

              User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

              Transaction Code

              OMDW

              IMG Menu

              Production à Material Requirements Planning à Planning à MRP Calculation à Define Rescheduling Check à Plant

              2.       On the screen, choose the button.

              3.       Make the following entries:

              Plnt

              FrmPO

              Fm.PR

              OrdIt

              Resch

              Tval.

              TolVa

              QMInL

              PrOrd

              SNot.

              BP01

              X

              X

              X

              100

              02

              02

              X

              X

              X

              BP02

              X

              X

              X

              100

              02

              02

              X

              X

              X

              BP03

              X

              X

              X

              100

              02

              02

              X

              X

              X

              1. Choose Choose                 Define Error Processing in Planning Run

                1.       To carry out the activity, choose one of the following navigation options:

                SAP <System>
                Role Menu

                User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                Transaction Code

                SPRO

                IMG Menu

                Production à Material Requirements Planning à Planning à MRP Calculation à Define Error Processing in the Planning Run

                2.       On the screen, choose the button.

                3.       Make the following entries:

                Plnt

                MPOP

                SMRPG

                BP01

                050

                001

                BP02

                050

                001

                BP03

                050

                001

                1. Choose Choose                 Define Range of Coverage

                  1.       To carry out the activity, choose one of the following navigation options:

                  SAP <System>
                  Role Menu

                  User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                  Transaction Code

                  SPRO

                  IMG Menu

                  Production à Material Requirements Planning à Planning à MRP Calculation à Define Range of Coverage Profile (Dynamic Safety Stock)

                  2.       On the screen, choose the button.

                  3.       Make the following entries:

                  Plnt

                  Prof.

                  Name 1

                  Per.

                  NoPe

                  Type

                  NDay

                  TRC1

                  RoC1

                  TRC2

                  RoC2

                  TRC3

                  Min1

                  BP01

                  001

                   

                  M

                  03

                  1

                  00

                  03

                  01

                  05

                  00

                  00

                  00

                  BP02

                  001

                   

                  M

                  03

                  1

                  00

                  03

                  01

                  05

                  00

                  00

                  00

                  BP03

                  001

                   

                  M

                  03

                  1

                  00

                  03

                  01

                  05

                  00

                  00

                  00

                   

                  Min2

                  Min3

                  Max1

                  Max2

                  MaxCv

                  LA

                  Name

                  00

                  00

                  00

                  00

                  00

                  EN

                  3 days in the next month, then 5 days

                  00

                  00

                  00

                  00

                  00

                  EN

                  3 days in the next month, then 5 days

                  00

                  00

                  00

                  00

                  00

                  EN

                  3 days in the next month, then 5 days

                  1. Choose Choose           Storage Cost percentage / Check Lot Sizing Procedure

                    1.       To carry out the activity, choose one of the following navigation options:

                    SAP <System>
                    Role Menu

                    User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                    Transaction Code

                    OMI4

                    IMG Menu

                    Production à Material Requirements Planning à Planning à Lot-Size Calculation à Check Lot-Sizing Procedure

                    2.       On the screen, choose the button.

                    3.       Make the following entries:

                    LS

                    LS

                    LI

                    Pds

                    Description EN

                    Description ZH

                    Sched

                    Ovlpg

                    Number of periods

                    DY

                    O

                    D

                    0

                    Dynamic lot size creation

                    动态批量创建

                     

                     

                    0

                    EX

                    S

                    E

                    0

                    Lot-for-lot order quantity

                    直接按批订货量

                     

                     

                    0

                    FS

                    S

                    S

                    0

                    Fixing and splitting

                    固定和分解

                     

                    +

                    0

                    FX

                    S

                    F

                    0

                    Fixed order quantity

                    固定订单数量

                     

                     

                    0

                    GR

                    O

                    G

                    0

                    Groff reorder procedure

                    Groff重订货程序

                     

                     

                    0

                    HB

                    S

                    H

                    0

                    Replenish to maximum stock level

                    补充到最大库存水平

                     

                     

                    0

                    MB

                    P

                    M

                    1

                    Monthly lot size

                    月批量

                    1

                     

                    0

                    PB

                    P

                    P

                    1

                    Period lot size = posting period

                    期间批量 = 记帐期间

                     

                     

                    0

                    PK

                    P

                    K

                    1

                    Period lot size acc. to plng calendar

                    根据计划日历的期间批量

                     

                     

                    0

                    SP

                    O

                    S

                    0

                    Part period balancing

                    部分期间余额

                     

                     

                    0

                    TB

                    P

                    T

                    1

                    Daily lot size

                    日批量

                     

                     

                    0

                    W2

                    P

                    W

                    1

                    Week 2

                    - 2

                    3

                     

                    0

                    WB

                    P

                    W

                    1

                    Weekly lot size

                    周批量

                     

                     

                    0

                    WI

                    O

                    W

                    0

                    Least unit cost procedure

                     

                     

                     

                    0

                    4.       On the screen, choose the button.

                    5.       Make the following entries:

                    Plant

                    Storage costs indicator

                    SC(%)

                    BP01

                    1

                    10,00

                    BP02

                    1

                    10,00

                    BP03

                    1

                    10,00

                    BP0X

                    1

                    10,00

                  2. Choose Choose

                   

                  3.2.11          Define External Procurement

                  1.       To carry out the activity, choose one of the following navigation options:

                  SAP <System>
                  Role Menu

                  User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                  Transaction Code

                  OMDT

                  IMG Menu

                  Production à Material Requirements Planning à Planning à Procurement Proposals à Define External Procurement

                  2.       On the screen, choose the button.

                  3.       Make the following entries:

                  Plnt

                  Purchasing proc.time

                  Sob

                  *

                  BP01

                  00

                  X

                  U

                  BP02

                  00

                  X

                  U

                  BP03

                  00

                  X

                  U

                   

                  1. Choose Choose           Define Line Item Number

                    1.       To carry out the activity, choose one of the following navigation options:

                    SAP <System>
                    Role Menu

                    User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                    Transaction Code

                    SPRO

                    IMG Menu

                    Production à Material Requirements Planning à Planning à Procurement Proposals à Define Line Item Numbers

                    2.       On the screen, choose the button.

                    3.       Make the following entries:

                    Plnt

                    ItPRq

                    ISTRe

                    BP01

                    00010

                    0100

                    BP02

                    00010

                    0100

                    BP03

                    00010

                    0100

                    1. Choose Choose

                     

                    3.2.13          Define BOM and Routing Selection

                    1.       To carry out the activity, choose one of the following navigation options:

                    SAP <System>
                    Role Menu

                    User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                    Transaction Code

                    SPRO

                    IMG Menu

                    Production à Material Requirements Planning à Planning à BOM Explosion/Routing Determination à Define BOM and Routing Selection

                    2.       On the screen, choose the button.

                    3.       Make the following entries:

                    Plnt

                    SelID

                    BP01

                    01

                    BP02

                    01

                    BP03

                    01

                    1. Choose Choose           Conversion Planned Order-> Prod Order

                      1.       To carry out the activity, choose one of the following navigation options:

                      SAP <System>
                      Role Menu

                      User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                      Transaction Code

                      OPPE

                      IMG Menu

                      Production à Material Requirements Planning à Procurement Proposals à Conversion of Procurement Proposals à Define Order Type for Conversion to Production/Process Order à Plant

                      2.       On the screen, choose the button.

                      3.       Make the following entries:

                      Plnt

                      Type

                      OTyp

                      BP01

                      PP01

                      PI01

                      BP02

                      PP01

                      PI01

                      BP03

                      PP01

                      PI01

                      BP0X

                      PP01

                      PI01

                       

                      1. Choose Choose

                       

                      3.2.15          Number of Planned Order

                      1.       To carry out the activity, choose one of the following navigation options:

                      SAP <System>
                      Role Menu

                      User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                      Transaction Code

                      OMDV

                      IMG Menu

                      Production à Material Requirements Planning à Procurement Proposals à Conversion of Procurement Proposals à Define Conversion of Planned Orders into Purchase Requisitions

                      2.       On the screen, choose the button.

                      3.       Make the following entries:

                      Plnt

                      PlOrd

                      BP01

                      500

                      BP02

                      500

                      BP03

                      500

                      BP0X

                      500

                      1. Choose Choose

                       

                      3.2.16          Item Number of Order Type

                      1.       To carry out the activity, choose one of the following navigation options:

                      SAP <System>
                      Role Menu

                      User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                      Transaction Code

                      OMDV

                      IMG Menu

                      Production à Material Requirements Planning à Procurement Proposals à Conversion of Procurement Proposals à Define Conversion of Planned Orders into Purchase Requisitions

                      2.       On the screen, choose the button.

                      3.       Make the following entries:

                      Object type

                      ItPRq

                      2

                      00010

                      1. Choose Choose

                       

                      3.2.17          Activate MRP and Set Up Planning File

                      1.       To carry out the activity, choose one of the following navigation options:

                      SAP <System>
                      Role Menu

                      User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                      Transaction Code

                      OMDU

                      IMG Menu

                      Production à  Material Requirements Planning à Planning File Entries à Activate MRP and Set Up Planning File

                      2.       On the screen, choose the button.

                      3.       Make the following entries:

                      Plnt

                      RP

                      BP01

                      X

                      BP02

                      X

                      BP03

                      X

                      BP0X

                      X

                      1. Choose Choose           Define Receipt Elements for Receipt Days' Supply

                        1.       To carry out the activity, choose one of the following navigation options:

                        SAP <System>
                        Role Menu

                        User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                        Transaction Code

                        SPRO

                        IMG Menu

                        Production à Material Requirements Planning à Evaluation à Define Receipt Elements for Receipt Days’ Supply

                        2.       On the screen, choose the button.

                        3.       Make the following entries:

                        Plnt

                        P

                        S

                        Q

                        P

                        P

                        R

                        APOrd

                        SN

                        BP01

                        X

                        X

                        X

                        X

                        X

                        X

                        X

                        X

                        BP02

                        X

                        X

                        X

                        X

                        X

                        X

                        X

                        X

                        BP03

                        X

                        X

                        X

                        X

                        X

                        X

                        X

                        X

                         

                        1. Choose Choose

                         

                        3.2.19          Define Scheduling Parameters for Planned Orders

                        1.       To carry out the activity, choose one of the following navigation options:

                        SAP <System>
                        Role Menu

                        User menu à J06 Production Planning à Installation à /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

                        Transaction Code

                        OPU5

                        IMG Menu

                        Production à Capacity Requirements Planning à Operations à Scheduling à Repetitive Manufacturing à Planning à Material Requirements Planning à Planning à Scheduling and Capacity Parameters à IMG Activities à Define scheduling parameters for planned orders

                        2.       On the screen, choose the button.

                        3.       Make the following entries:

                        Plnt

                        OG

                        OrdT

                        PrCtr

                        Sch.H det.

                        SD

                        Sch

                        Cap

                        BP01

                        2

                        *

                        *

                        000

                        01

                        X

                        X

                        BP01

                        2

                        PE

                        *

                        000

                        01

                         

                         

                        BP02

                        2

                        *

                        *

                        000

                        01

                        X

                        X

                        BP02

                        2

                        PE

                        *

                        000

                        01

                         

                         

                        BP03

                        2

                        *

                        *

                        000

                        01

                        X

                        X

                        BP03

                        2

                        PE

                        *

                        000

                        01

                         

                         

                         

                        Plnt

                        Sch.H

                        Sch.H

                        Rate. horzn

                        SR

                        Sch

                        Cap

                        RCutPlgHor.

                        SR

                        BP01

                        000

                        000

                        000

                        02

                         

                         

                        000

                        03

                        BP01

                        000

                        000

                        000

                        02

                        X

                        X

                        000

                        03

                        BP02

                        000

                        000

                        000

                        02

                         

                         

                        000

                        03

                        BP02

                        000

                        000

                        000

                        02

                        X

                        X

                        000

                        03

                        BP03

                        000

                        000

                        000

                        02

                         

                         

                        000

                        03

                        BP03

                        000

                        000

                        000

                        02

                        X

                        X

                        000

                        03

                         

                        Plnt

                        SchedLvlBD

                        Adj.dates

                        ST

                        SiP

                        BP01

                         

                         

                        2

                        000

                        BP01

                        1

                        2

                        2

                        000

                        BP02

                         

                         

                        2

                        000

                        BP02

                        1

                        2

                        2

                        000

                        BP03

                         

                         

                        2

                        000

                        BP03

                        1

                        2

                        2

                        000

                         

                        Plnt

                        RL

                        %RF

                        %RF

                        %RF

                        %RF

                        %RF

                        %RF

                        BP01

                        0

                        0

                        0

                        0

                        0

                        0

                        0

                        BP01

                        0

                        0

                        0

                        0

                        0

                        0

                        0

                        BP02

                        0

                        0

                        0

                        0

                        0

                        0

                        0

                        BP02

                        0

                        0

                        0

                        0

                        0

                        0

                        0

                        BP03

                        0

                        0

                        0

                        0

                        0

                        0

                        0

                        BP03

                        0

                        0

                        0

                        0

                        0

                        0

                        0

                         

                        1. Choose Choose

                         

                        3.3    Shop Floor Control

                        3.3.1                Define Routing Selection ID

                        6.       To carry out the activity, choose one of the following navigation options:

                        SAP <System>
                        Role Menu

                        User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC)

                        Transaction Code

                        OPEB

                        IMG Menu

                        Production à  Basic Data à Routing à Routing Selection à Select Automatically

                        7.       On the screen, choose the button.

                        8.       Make the following entries:

                        ID

                        SP

                        TLType

                        Usage

                        Description EN

                        Description ZH

                        Stat

                        Description of the status

                        1

                        1

                        N

                        1

                        Production

                        生产

                        4

                        Released (general)

                        1

                        2

                        N

                        1

                        Production

                        生产

                        2

                        Released for order

                        1

                        3

                        2

                        1

                        Production

                        生产

                        4

                        Released (general)

                        1

                        4

                        2

                        1

                        Production

                        生产

                        2

                        Released for order

                        1

                        5

                        R

                        1

                        Production

                        生产

                        4

                        Released (general)

                        1

                        6

                        R

                        1

                        Production

                        生产

                        2

                        Released for order

                        2

                        1

                        R

                        1

                        Production

                        生产

                        4

                        Released (general)

                        2

                        2

                        R

                        1

                        Production

                        生产

                        2

                        Released for order

                        3

                        1

                        3

                        1

                        Production

                        生产

                        4

                        Released (general)

                        3

                        2

                        3

                        1

                        Production

                        生产

                        2

                        Released for order

                        4

                        1

                        2

                        1

                        Production

                        生产

                        4

                        Released (general)

                        4

                        2

                        2

                        1

                        Production

                        生产

                        2

                        Released for order

                        Q1

                        1

                        Q

                        1

                        Production

                        生产

                        4

                        Released (general)

                        1. Choose Choose                 Define Standard Values Parameters

                          1.       To carry out the activity, choose one of the following navigation options:

                          SAP <System>
                          Role Menu

                          User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC)

                          Transaction Code

                          OP7B

                          IMG Menu

                          Production à Master Data à Work Centerà General Data à Standard Value à Define Parameters

                          2.       On the screen, choose the button.

                          3.       Make the following entries:

                          Parameter

                          Origin

                          Short Key Word

                          Key Word EN

                          Key Word ZH

                          Dimension

                          Standard Value

                          Standard Value Unit

                          Field Name

                          YB_001

                          1

                           

                          BP Max. Capacity in KG

                          BP KG 最大能力

                          MASS

                          0

                          KG

                           

                          YB_002

                          1

                           

                          BP Max. Capacity in PC

                          BP PC 最大能力

                          AAAADL

                          0

                          ST

                           

                          YB_101

                          2

                           

                          BP Dur. Ress./Batch

                          BP 批量预定

                          TIME

                          0

                          H

                           

                          YB_102

                          2

                           

                          BP Dur. Pers./Batch

                          BP 批量人工

                          TIME

                          0

                          H

                           

                          YB_103

                          2

                           

                          BP Setup per Operation

                          BP 工序准备

                          TIME

                          0

                          H

                           

                          YB_104

                          2

                           

                          BP Setup per Batch

                          BP 批量准备

                          TIME

                          0

                          H

                           

                          YB_105

                          2

                           

                          BP Clean. per Operation

                          BP 工序清洁

                          TIME

                          0

                          H

                           

                          YB_106

                          2

                           

                          BP Clean. per Batch

                          BP 批量清洁

                          TIME

                          0

                          H

                           

                          YB_107

                          2

                           

                          BP Function Clock

                          BP 职能时钟

                          TIME

                          0

                          H

                           

                          YB_108

                          2

                           

                          BP Process Flow Rate

                          BP 工序流率

                          TIME

                          0

                          H

                           

                          YB_109

                          2

                           

                          BP Labor

                          BP 人工时间

                          TIME

                          0

                          MIN

                           

                          YB_110

                          2

                          Overhead

                          BP Overhead

                          BP 费用时间

                          TIME

                          0

                          H

                           

                          YB_112

                          2

                          Energy

                          BP Energy

                          BP 能量

                          ENERGY

                          0

                          KWH

                           

                          SAP_01

                          2

                          Setup

                          Setup

                          准备

                          TIME

                          0

                          MIN

                           

                          SAP_02

                          2

                          Machine

                          Machine

                          机器

                          TIME

                          0

                          MIN

                           

                          SAP_03

                          2

                          Labor

                          Labor

                          工时

                          TIME

                          0

                          MIN

                           

                          SAP_04

                          2

                          Op time 1

                          Standard value 1

                          标准值 1

                          TIME

                          0

                          MIN

                           

                          SAP_05

                          2

                          Op time 2

                          Standard value 2

                          标准值 2

                          TIME

                          0

                          MIN

                           

                          SAP_06

                          2

                          Op time 3

                          Standard value 3

                          标准值 3

                          TIME

                          0

                          MIN

                           

                          SAP_07

                           

                          Work

                          Work (internal proc)

                          工作 (内部加工)

                           

                          0

                           

                          ARBEI

                          SAP_08

                           

                          Base qty

                          Base quantity

                          基本数量

                           

                          1

                           

                          BMSCH

                          SAP_09

                           

                          Op. qty.

                          Operation quantity

                          工序数量

                           

                          1

                           

                          MGVRG

                          SAP_10

                           

                          Duration

                          Other formula

                          其它公式

                          TIME

                          0

                          MIN

                          DAUNO

                          SAP_11

                           

                          Splits

                          Operation splits

                          工序分解

                           

                          1

                           

                          SPLIM

                          SAP_12

                          6

                          PRT par. 1

                          PRT parameter 1

                          PRT 参数 1

                          AAAADL

                          1

                          LE

                           

                          SAP_13

                          6

                          PRT par. 2

                          PRT parameter 2

                          PRT 参数 2

                          AAAADL

                          1

                          LE

                           

                          SAP_14

                          4

                          User field

                          User field

                          用户字段

                          AAAADL

                          1

                          ST

                           

                          SAP_16

                          5

                          PRT value

                          PRT std value

                          PRT 标准值

                           

                          1

                           

                          EWVGW

                          SAP_17

                           

                          Number of

                          Number of employees

                          员工数

                           

                          5

                           

                          ANZMA

                          SAP_55

                          1

                          Time

                          Res. dep. duration

                          限制开发期

                          TIME

                          1

                          H

                           

                          YB_113

                          2

                          Machine

                          BP Machining Time

                          BP 机器时间

                          TIME

                          0

                          MIN

                           

                          YB_114

                           

                          Op. qty.

                          Operation quantity

                          BP 工序数量

                           

                          1

                           

                          MGVRG

                          YB_115

                           

                          Base qty

                          Base quantity

                          BP 基本数量

                           

                          1

                           

                          BMSCH

                          YB_116

                           

                          Splits

                          Operation splits

                          BP 工序分解

                           

                          1

                           

                          SPLIM

                           

                          1. Choose Choose                 Define Standard Value key

                            1.       To carry out the activity, choose one of the following navigation options:

                            SAP <System>
                            Role Menu

                            User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC)

                            Transaction Code

                            OP19

                            IMG Menu

                            Production Planning for Process Industries à Master Data à Resource à General Data à Standard Value à Define Standard Value Key

                            2.       On the screen, choose the button.

                            3.       Make the following entries:

                            SVK

                            Text EN

                            Text ZH

                            Params.

                            Params.

                            Params.

                            Params.

                            Params.

                            Params.

                            YB01

                            BP: Batch M/P + Setup/Cleaning

                            BP 批量生产及准备

                            YB_103

                            YB_101

                            YB_102

                            YB_105

                            YB_110

                             

                            YB02

                            BP: Cont. M/P + Setup/Cleaning

                            BP 连续生产及准备

                            YB_103

                            YB_107

                            YB_108

                            YB_109

                            YB_105

                            YB_110

                            YB03

                            Process Manufacturing Energy

                            BP 流程式制造能量

                            YB_112

                             

                             

                             

                             

                             

                            YB04

                            BP Normal production

                            BP 常规生产

                            YB_103

                            YB_113

                            YB_109

                             

                             

                             

                            SAP0

                            No standard values

                            无标准值

                             

                             

                             

                             

                             

                             

                            SAP1

                            Normal production

                            常规生产

                            SAP_01

                            SAP_02

                            SAP_03

                             

                             

                             

                            SAP2

                            Variable production

                            可变化的生产

                            SAP_01

                            SAP_02

                            SAP_03

                            SAP_04

                            SAP_05

                            SAP_06

                             

                            1. Choose Choose                 Determine Person Responsible

                              1.       To carry out the activity, choose one of the following navigation options:

                              SAP <System>
                              Role Menu

                              User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC)

                              Transaction Code

                              SPRO

                              IMG Menu

                              Production à Basic Data à Work Center à General Data à Determine Person Responsible

                              2.       On the screen, choose .

                              3.       Make the following entries:

                              Plnt

                              Res

                              Name                 

                              Name                 

                              BP01

                              001

                              Person Responsible 001

                              工作中心负责人001

                              BP01

                              A  

                              Person Responsible A

                              工作中心负责人A

                              BP02

                              001

                              Person Responsible 001

                              工作中心负责人001

                              BP02

                              A  

                              Person Responsible A

                              工作中心负责人A

                              BP03

                              001

                              Person Responsible 001

                              工作中心负责人001

                              BP03

                              A  

                              Person Responsible A

                              工作中心负责人A

                              1. Choose Choose                 Define Formulas for Work centers

                                1.       To carry out the activity, choose one of the following navigation options:

                                SAP <System>
                                Role Menu

                                User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC)

                                Transaction Code

                                OP54

                                IMG Menu

                                Production à Master Data à Work Centerà Costing à Define formulas for work centers

                                2.       On the screen, choose the button.

                                3.       Make the following entries:

                                Formula Key

                                Text EN

                                Text ZH

                                Formula

                                Generate

                                Allowed for Costing

                                Work Center for req.

                                Allowed for sched.

                                YB_001

                                M: Reqmt with YB

                                BP M 需求时间

                                ( SAP_09 DIV ( SAP_08 ) + 1 ) * YB_101

                                 

                                YB_002

                                PP: Reqmt with YB01

                                BP P 需求时间

                                ( SAP_09 DIV ( SAP_08 ) + 1 ) * YB_102

                                 

                                YB_003

                                M: Duration YB01

                                BP M 过程

                                YB_103 + ( ( SAP_09 DIV ( SAP_08 ) + 1 ) * YB_101 ) + YB_105

                                 

                                 

                                YB_004

                                P: Duration YB01

                                BP P 过程

                                YB_103 + ( ( SAP_09 DIV ( SAP_08 ) + 1 ) * YB_102 ) + YB_105

                                 

                                 

                                YB_005

                                M: Reqmt setup

                                BP M 准备

                                YB_103

                                 

                                YB_006

                                P: Reqmt cleanout

                                BP P 清洁时间

                                YB_105

                                 

                                YB_007

                                M: Reqmt with YB02

                                BP P 需求时间

                                YB_108 + ( YB_107 * SAP_09 / SAP_08 )

                                 

                                YB_008

                                P: Reqmt with YB02

                                BP P 需求时间

                                YB_109 + ( YB_107 * SAP_09 / SAP_08 )

                                 

                                YB_009

                                M: Duration YB02

                                BP M 需求时间

                                YB_103 + YB_108 + ( YB_107 * SAP_09 / SAP_08 ) + YB_105

                                 

                                 

                                YB_010

                                Duration YB02

                                BP 过程

                                YB_103 + YB_109 + ( YB_107 * SAP_09 / SAP_08 ) + YB_105

                                 

                                 

                                YB_011

                                Energy

                                BP 能量

                                ( ( ( SAP_09 / SAP_08 ) + 1 ) * YB_112 )

                                 

                                SAP001

                                Prod.: Setup time

                                生产: 准备时间

                                SAP_01

                                 

                                SAP002

                                Prod.: Machine time

                                生产: 机时

                                SAP_02 * SAP_09 / SAP_08 / SAP_11

                                 

                                SAP003

                                Prod.: Labor time

                                生产: 工时

                                SAP_03 * SAP_09 / SAP_08 / SAP_11

                                 

                                SAP004

                                Proj:Netw/Maint.Time

                                预测: 内部加工时间

                                SAP_10

                                 

                                SAP005

                                Prod: Setup rqmts

                                生产:准备需求

                                SAP_01 * SAP_11

                                 

                                SAP006

                                Prod.: Machine rqmts

                                生产:机器需求

                                SAP_02 * SAP_09 / SAP_08

                                 

                                SAP007

                                Prod.: Labor rqmts

                                生产:工时需求

                                SAP_03 * SAP_09 / SAP_08

                                 

                                SAP008

                                Proj:RqmtsNetwkMaint

                                生产: 内部加工需求

                                SAP_07

                                 

                                YB_012

                                BP Setup time

                                BP 准备时间

                                YB_103

                                YB_013

                                BP Machine time

                                BP 机时

                                YB_113 * YB_114 / YB_115 / YB_116

                                YB_014

                                BP Labor time

                                BP 工时

                                YB_109 * YB_114 / YB_115 / YB_116

                              2. Choose Choose

                              3.3.6                Define Control Keys

                              1.       To carry out the activity, choose one of the following navigation options:

                              SAP <System>
                              Role Menu

                              User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC)

                              Transaction Code

                              OPJ8

                              IMG Menu

                              Production ® Shop Floor Control ® Master Data ® Routing Data ® Define Control Keys

                              2.       On the screen, choose the button.

                              3.       Make the following entries:

                              Control Key

                              Description EN

                              Description ZH

                              Scheduling

                              Det. Cap. Requirements

                              Insp. Char. required

                              Aut. Goods receipt

                              Cost

                              YB01

                              BP Process Manufacturing

                              BP 流程式制造

                              X

                              X

                               

                               

                              X

                              YB02

                              BP Process Manufacturing with inspection

                              BP 具有检验功能的流程式制造

                              X

                              X

                              X

                               

                              X

                              YB03

                              BP Process manuf. with autom. goods receipt

                              BP 具有自动货物接收功能的流程式制造

                              X

                              X

                               

                              X

                              X

                              YB04

                              BP Process Manufacturing with autom. GR(HU)

                              BP 工艺路线/参照工序集 - 内部加工

                              X

                              X

                               

                               

                              X

                              YB05

                              BP Routing/Ref. op. set - external proc.

                              BP 工艺路线/参照工序集 - 外部加工

                              X

                               

                               

                               

                              X

                              1. Choose Choose                 Define Scheduling Margin Key

                                1.       To carry out the activity, choose one of the following navigation options:

                                SAP <System>
                                Role Menu

                                User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC)

                                Transaction Code

                                SPRO

                                IMG Menu

                                Production à Shop Floor Control à Operations à Scheduling à Define Scheduling Margin Key

                                2.       On the screen, choose the button.

                                3.       Make the following entries:

                                Plnt

                                SMKey

                                Op.Pd

                                Float after pro.

                                FloatBefProd.

                                Release period

                                BP01

                                000

                                000

                                000

                                000

                                000

                                BP01

                                001

                                010

                                001

                                002

                                005

                                BP02

                                000

                                000

                                000

                                000

                                000

                                BP02

                                001

                                010

                                001

                                002

                                005

                                BP03

                                000

                                000

                                000

                                000

                                000

                                BP03

                                001

                                010

                                001

                                002

                                005

                                1. Choose Choose                 Define Reasons for Variances

                                  1.       To carry out the activity, choose one of the following navigation options:

                                  SAP <System>
                                  Role Menu

                                  User menu à J06 Production Planning à Installation à /SMB12/S200_J06_01 - Shop Floor Control (SFC)

                                  Transaction Code

                                  OPK5

                                  IMG Menu

                                  Production à Shop Floor Control à Operations à Confirmation à Define Reasons for Variances

                                  2.       On the screen, choose the button.

                                  3.       Make the following entries:

                                  Plnt

                                  Cause

                                  LA

                                  Description EN

                                  Description ZH

                                  BP01

                                  0001

                                  EN

                                  Machine malfunction

                                  BP 机器故障 工厂BP01

                                  BP01

                                  0002

                                  EN

                                  Operating error

                                  BP 操作错误 工厂BP01

                                  BP01

                                  0003

                                  EN

                                  Defective material

                                  BP 有缺陷物料 工厂BP01

                                  BP02

                                  0001

                                  EN

                                  Machine malfunction

                                  BP 机器故障 工厂BP02

                                  BP02

                                  0002

                                  EN

                                  Operating error

                                  BP 操作错误 工厂BP02

                                  BP02

                                  0003

                                  EN

                                  Defective material

                                  BP 有缺陷物料 工厂BP02

                                  BP03

                                  0001

                                  EN

                                  Machine malfunction

                                  BP 机器故障 工厂BP03

                                  BP03

                                  0002

                                  EN

                                  Operating error

                                  BP 操作错误 工厂BP03

                                  BP03

                                  0003

                                  EN

                                  Defective material

                                  BP 有缺陷物料 工厂BP03

                                  1. Choose Choose Back.